Pool ResurfacingConnect

Pool remodeling

Pool Remodeling in the Phoenix Area

Free matching service for homeowners · We connect you with independent, licensed local pool resurfacing companies · We don't do the work ourselves

Pool remodeling goes beyond a new finish to include tile, coping, decking, lighting, equipment or features like a tanning ledge. There's no honest single price, so this page prices each piece with sourced Arizona ranges. Arizona remodels typically take about 2 to 9 weeks depending on season and scope. We'll match you with up to 5 licensed, insured local remodelers, free and with no obligation.

  • Finish, tile, coping and deck in one project
  • One drain instead of several
  • Licensed, insured local remodelers
  • Free quote, no obligation
  1. 1Tell us what you need. Answer a few quick questions. It takes about 30 seconds.
  2. 2Get matched. We share your request with up to 5 licensed, insured local pool resurfacing companies.
  3. 3Compare and decide. Compare quotes from the companies that reach out and decide what's right for you. No obligation.

Get matched with up to 5 pool resurfacing pros

Free, no obligation. Takes about 30 seconds.

Add email or project details (optional)

100% free for homeowners. No obligation. We share your request with up to 5 licensed local companies that serve your ZIP code, and they may contact you by phone, text or email. Some areas have fewer. Prefer not to get calls or texts? Email hello@poolresurfacingconnect.com instead.

What a pool remodel can include

A remodel is any project that changes more than the interior surface. Some homeowners simply pair a new finish with new tile. Others rebuild the whole backyard around the pool. Common pieces include:

  • New interior finish: plaster, quartz, pebble or tile. See pool replastering, quartz pool finish and pebble pool finish.
  • Waterline tile and coping: a fresh edge that ties the look together. See pool tile and coping.
  • Deck resurfacing or replacement: pavers, travertine, stamped or coated concrete.
  • Lighting: many homeowners switch to LED lights while the pool is empty.
  • Equipment: pumps, filters, heaters and automation.
  • Features: tanning ledges, steps, benches, water features and spas.
  • Safety: barriers, gates and covers that meet local code.

Pool remodel vs. resurfacing: why do it all at once?

Resurfacing fixes the interior. A remodel lets you fix everything that's dated or failing at once. Since nearly any interior work requires draining, it's the natural moment to tackle tile, lights and plumbing that sit below the waterline.

Resurfacing vs. remodel at a glance
ResurfacingRemodel
What changesInterior finish onlyFinish plus any of tile, coping, deck, lights, equipment, features
Typical Arizona cost$3,500 – $15,000 by finishSum of each component
Typical timeAbout 5 – 14 days of workAbout 2 – 9 weeks by scope and season
PermitsOften none for the finish itselfMay be needed for structure, plumbing, electrical, gas or barriers

Costs: Shasta Pools (Jan 2026). Times: Swimply (resurfacing), Shasta Pools (remodel). Check permit needs with your city and contractor.

Rosie on the House suggests handling related work like the deck, lighting and pump during the same project because costs may be higher if you wait. Doing it all together also means one round of construction in your backyard instead of several.

  • One drain and refill instead of several
  • A matched look across finish, tile, coping and deck
  • A chance to fix cracks, leaks and old plumbing
  • Energy-saving upgrades like LED lights and efficient pumps
  • Better safety features for kids and pets

How much does a pool remodel cost?

A pool remodel costs the sum of its parts. In Arizona, a new finish runs about $3,500 to $15,000, waterline tile $25 to $30 per linear foot and deck replacement $5,400 to $13,500 for about 900 square feet. Equipment, lighting and features add more.

Remodels vary too much for one honest price range, so add up the pieces you want. Here are typical ranges for common parts of a remodel, from published sources.

Typical costs for common remodel components
ComponentTypical costSource
White plaster finish$3,500 – $6,500Shasta Pools (AZ, 2026)
Quartz finish$7,000 – $10,000Shasta Pools (AZ, 2026)
Pebble / aggregate finish$6,000 – $15,000Shasta Pools (AZ, 2026)
All-tile interior$15,000 – $30,000Shasta Pools (AZ, 2026)
Waterline tile$25 – $30 per linear footShasta Pools (AZ, 2026)
Deck resurfacing$3 – $12 per sq ftShasta Pools (AZ, 2026)
Deck replacement, about 900 sq ft$5,400 – $13,500Shasta Pools (AZ, 2026)

Equipment, lighting, features and coping vary widely by product and weren't priced in our sources. The company you hire will quote your exact project.

Our pool resurfacing cost guide explains what drives each of these numbers and how to compare quotes.

Tell us what you want to change and get matched with licensed local remodelers.

Get My Free Quotes

How long does a pool remodel take in Arizona?

A pool remodel in Arizona typically takes about 2 to 9 weeks, depending on scope and season. One Phoenix remodeler says most take 2 to 4 weeks. An Arizona builder estimates 3 to 6 weeks in winter and 5 to 9 weeks in summer, when heat and monsoon storms slow work.

Timelines depend on scope, permits, weather and the contractor's schedule. Here is how one Arizona builder breaks it down by season:

Typical Arizona remodel timelines by season
SeasonTypical lengthNotes
Winter3 – 6 weeksCooler temps; builders often have more openings
Spring4 – 8 weeksDemand rises around March
Summer5 – 9 weeksTriple-digit heat and monsoon storms can cause delays
Fall4 – 7 weeksA strong second choice to winter

Source: Shasta Pools. Your contractor will give you a schedule for your project.

The same builder recommends planning three to six months ahead and booking spring projects around January or February.

How to plan a pool remodel

  1. List what bothers you

    Rough surface, scaled tile, cracked deck, old pump, no shade? Write it down so the contractor can scope everything at once.

  2. Set a budget range

    Use the component costs above to build a rough budget. Leave some room for repairs found once the pool is drained.

  3. Check HOA and city rules

    Many communities have HOA guidelines, and some changes need permits. Your contractor can explain what applies.

  4. Pick finishes together

    Look at finish, tile, coping and deck samples side by side, outdoors and wet.

  5. Keep the empty time short

    A drained pool can be lifted by groundwater pressure, and PoolResearch warns the risk rises after heavy rain and the longer a pool sits empty. Ask the contractor how long the shell will be dry and how they handle relief valves.

  6. Get a written scope

    Make sure the quote lists every piece of work, the schedule, who handles permits and what warranties apply.

Have your wish list ready? Get free remodel quotes from licensed local companies.

Get My Free Quotes

Who can remodel a pool in Arizona?

Arizona's contractor classifications include B-5 and B-6 general swimming pool contractor licenses for building and repairing pools, and dual KA-5 and KA-6 licenses that pair them with commercial pool classes. A general remodeling contractor (B-3) must subcontract pool work to an appropriately licensed contractor, and the R-6 service and repair license doesn't cover full interior or deck replacement. Electrical, gas and plumbing work may need their own licensed trades.

Check every company on the Arizona Registrar of Contractors website. We only send requests to companies that give us an active Arizona ROC license number and proof of insurance. See our Phoenix-area locations, including pool resurfacing in Peoria and Queen Creek.

Frequently asked questions

How much does a full pool remodel cost?

It depends on what you include. Add up the pieces: an Arizona builder lists finishes from about $3,500 for plaster to $15,000 for pebble, waterline tile at $25 to $30 per linear foot and deck replacement at $5,400 to $13,500 for about 900 square feet. Equipment, lighting and features add more. A contractor's itemized quote gives the real total.

What's the best time of year to remodel a pool in Arizona?

An Arizona builder calls winter the best time, with fall a close second. Cooler weather is easier on new plaster and concrete, and builders often have more openings. July and August are the hardest months because of heat and monsoon storms. Plan three to six months ahead for spring projects.

Do I need a permit to remodel my pool?

It depends on your city and the scope. A simple resurface often doesn't need one, but changes to the structure, plumbing, electrical, gas or barriers may. Your HOA may also require approval. Ask the contractor who will pull any permits, and get that responsibility written into the quote.

Can I change my pool's shape or depth during a remodel?

Sometimes. Adding steps, benches or a tanning ledge is common. Bigger changes to shape or depth are more involved and may need engineering and permits. A licensed swimming pool contractor can tell you what's practical for your pool's shell and what it might add to cost and timeline.

Should I replace equipment during a remodel?

If your pump, filter or heater is aging, a remodel is a convenient time. The pool is already offline and plumbing is accessible. Rosie on the House suggests tackling items like the pump during the same project since costs may be higher later. Ask your contractor which equipment is nearing the end of its life.

Will a pool remodel add value to my home?

There's no reliable sourced figure for that, and it varies by market and home. A worn, stained pool can be a turnoff to buyers, and a fresh, safe pool is easier to enjoy and show. If resale is your main goal, ask a local real estate agent which upgrades buyers in your area care about.

Ready to get started?

Tell us what you need, and we'll share your request with up to 5 licensed local pool resurfacing companies that serve your area. Free, with no obligation.

Get My Free Quotes
Get My Free Quotes